Our Projects

Solar Installations Worldwide

Selected project references. Each case states location, year, sector and the scope DLXN supplied; where a figure or a client name is not ours to publish, the case says so instead of inventing one. Ask our team for reference details relevant to your market.

Projects at a glance: location, year, sector and scope

LocationYearSectorScope
Anji County, Zhejiang, China2026BIPV CarportSupplied and installed by DLXN: 155 × 590 W modules (91.45 kWp) and two GoodWe 50 kW grid-tied inverters on a…
China (national pilot — 140 stations)2026Off-Grid HybridNationwide pilot for China Meteorological Administration baseline stations: 2.13 kWp PV, 300 W wind turbine, 1…
Nigeria2026Commercial ESSHotel power supply package: 144 × 640 W modules (92.16 kWp), a 100 kW GoodWe hybrid inverter and 241 kWh batte…
Yulin, Shaanxi, China2024Off-Grid HybridOff-grid hybrid power for a China Oil & Gas Pipeline Network valve station: 6.6 kWp PV, 1 kW wind, 43 kWh LiFe…
Xiong'an New Area, Hebei, China2024Commercial RooftopGrid-tied rooftop array on a district energy station: 550 W × 280 = 154 kWp with a GoodWe 100 kW plus two 25 k…
Lanzhou, Gansu, China2024Institutional RooftopInstitutional grid-tied array in Gansu: 550 W × 100 = 55 kWp through a GoodWe 50 kW inverter. Designed, suppli…
Northeast Asia2026Module SupplyExport order of 1,800 custom-built modules in four wattages — 80 W × 300, 100 W × 800, 200 W × 300, 230 W × 40…
91.45 kWp BIPV Solar Carport — Guoneng Anji Meixi Power Plant, Zhejiang
BIPV Carport2026

91.45 kWp BIPV Solar Carport — Guoneng Anji Meixi Power Plant, Zhejiang

📍 Anji County, Zhejiang, China

Supplied and installed by DLXN: 155 × 590 W modules (91.45 kWp) and two GoodWe 50 kW grid-tied inverters on a steel BIPV carport, completed in 20 days.

140-Site Meteorological Baseline Station Pilot — Hybrid PV/Wind Retrofit
Off-Grid Hybrid2026

140-Site Meteorological Baseline Station Pilot — Hybrid PV/Wind Retrofit

📍 China (national pilot — 140 stations)

Nationwide pilot for China Meteorological Administration baseline stations: 2.13 kWp PV, 300 W wind turbine, 12 kWh gel battery bank and a 3 kW hybrid inverter with automatic source switching. DLXN supplied the full equipment set and handled construction and commissioning on part of the sites.

92 kWp Solar + 241 kWh Storage for a Hotel — Nigeria
Commercial ESS2026

92 kWp Solar + 241 kWh Storage for a Hotel — Nigeria

📍 Nigeria

Hotel power supply package: 144 × 640 W modules (92.16 kWp), a 100 kW GoodWe hybrid inverter and 241 kWh battery storage, shipped as a complete kit with mounting, cabling and remote commissioning support.

Pipeline Valve Station Power — Yulin, Shaanxi (Satellite Telemetry)
Off-Grid Hybrid2024

Pipeline Valve Station Power — Yulin, Shaanxi (Satellite Telemetry)

📍 Yulin, Shaanxi, China

Off-grid hybrid power for a China Oil & Gas Pipeline Network valve station: 6.6 kWp PV, 1 kW wind, 43 kWh LiFePO4, a 5 kW low-frequency hybrid inverter and a 10 kW diesel generator as backup. Designed, supplied, installed and commissioned by DLXN.

154 kWp Rooftop PV — Rongdong Energy Station No. 5, Xiong'an New Area
Commercial Rooftop2024

154 kWp Rooftop PV — Rongdong Energy Station No. 5, Xiong'an New Area

📍 Xiong'an New Area, Hebei, China

Grid-tied rooftop array on a district energy station: 550 W × 280 = 154 kWp with a GoodWe 100 kW plus two 25 kW inverters. Designed, supplied, installed and commissioned by DLXN in August 2024.

55 kWp Grid-Tied PV — Funeral Service Facility, Honggu District, Lanzhou
Institutional Rooftop2024

55 kWp Grid-Tied PV — Funeral Service Facility, Honggu District, Lanzhou

📍 Lanzhou, Gansu, China

Institutional grid-tied array in Gansu: 550 W × 100 = 55 kWp through a GoodWe 50 kW inverter. Designed, supplied, installed and commissioned by DLXN.

1,800 Custom Modules, 80–230 W — Distributor Order, Northeast Asia
Module Supply2026

1,800 Custom Modules, 80–230 W — Distributor Order, Northeast Asia

📍 Northeast Asia

Export order of 1,800 custom-built modules in four wattages — 80 W × 300, 100 W × 800, 200 W × 300, 230 W × 400 — totalling 256 kWp, built to order in Baoding and shipped November 2026.